1-Hour I-Joist Floor Assembly
1-hour floor/ceiling assembly with I-joist floor framing, gypsum concrete topping, and resilient channels per UL L518.
1-hour floor/ceiling assembly with I-joist floor framing, gypsum concrete topping, and resilient channels per UL L518.