Skip to content
Home > CAD & Revit - Light Frame > 1-Hour STC 58 I-Joist Floor Assembly

1-Hour STC 58 I-Joist Floor Assembly

1-hour floor/ceiling assembly with I-joist floor framing, gypsum concrete topping, carpet, and resilient channels. Fire rating per UL L518; STC 58 and IIC 54 per National Evaluation Service Report NER-200.

1-Hour STC 58 I-Joist Floor Assembly

1-hour floor/ceiling assembly with I-joist floor framing, gypsum concrete topping, carpet, and resilient channels. Fire rating per UL L518; STC 58 and IIC 54 per National Evaluation Service Report NER-200.
AF13-1HourSTC58FloorIJoist