BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//WoodWorks | Wood Products Council - ECPv6.17.4.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:WoodWorks | Wood Products Council
X-ORIGINAL-URL:https://www.woodworks.org
X-WR-CALDESC:Events for WoodWorks | Wood Products Council
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20240310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20241103T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20250309T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20251102T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20260308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20261101T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20240310T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20241103T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20260308T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20261101T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:America/Detroit
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20251106T110000
DTEND;TZID=America/Los_Angeles:20251106T133000
DTSTAMP:20250923T190932Z
CREATED:20250923T190301Z
LAST-MODIFIED:20250923T190932Z
UID:10000405-1762426800-1762435800@www.woodworks.org
SUMMARY:Mass Timber in Multi-family Construction: Mid-Rise and Beyond
DESCRIPTION:Regional Online Seminar (WA\, AK\, ID-North)\n\n\nCan mass timber make financial sense for mid-rise multi-family construction? What new opportunities does the 2021 International Building Code create for mass timber housing in the 6 to 18-story range? While mass timber is often associated with one-off projects that celebrate innovation over repeatability\, options for multi-family buildings that provide a strong return on investment have never been greater—if a designer understands how to leverage the benefits of these materials in the context of the new mass timber construction types. This presentation will review decisions that are key to the viability of mass timber multi-family projects\, including construction type selection\, grid layout\, approach to achieving fire-resistance ratings\, lateral system selection\, and acoustics. \n  \nSpeaker: Michael Muller\, PE\, SE | WoodWorks \n  \nCredits: Attendees can earn 2.0 AIA/CES HSW LUs\, 2.0 PDH credits or 0.2 ICC credits \n  \nOnline Attendees: \n\nWoodWorks will send each attendee a certificate of completion within 2 weeks via email.\nPlease note that to receive a certificate\, attendees must stay for the duration of the event.\n\n  \nFor questions or additional information\, please contact: \nJaime Krohn\, CMP | jaime@woodworks.org | (312) 841-8272 \n  \nImage: The Canyons\, Kaiser+Path\, Catena Consulting Engineers\, Photo Jeremy Bittermann
URL:https://www.woodworks.org/event/q4-25-mass-timber-multi-family-muller-online/
LOCATION:OR
CATEGORIES:Online
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/Canyons-Exterior-SW-corner-night_Bittermann-1-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251111T130000
DTEND;TZID=America/New_York:20251111T140000
DTSTAMP:20260420T202737Z
CREATED:20251001T204626Z
LAST-MODIFIED:20260420T202737Z
UID:10000408-1762866000-1762869600@www.woodworks.org
SUMMARY:Designing Light-Frame Wood Structures Over Podiums: Seismic Considerations
DESCRIPTION:
URL:https://www.woodworks.org/event/designing-light-frame-wood-structures-over-podiums-seismic-considerations/
LOCATION:OR
CATEGORIES:Online
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/GabeBorder-Holst-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20251112T103000
DTEND;TZID=America/Chicago:20251112T133000
DTSTAMP:20251015T171932Z
CREATED:20251015T152557Z
LAST-MODIFIED:20251015T171932Z
UID:10000412-1762943400-1762954200@www.woodworks.org
SUMMARY:Early Design Decisions: Priming Mass Timber Projects for Success
DESCRIPTION:Regional In-Person Seminar (Houston\, TX)\n\n\nMass timber is a unique\, non-commodity building material\, and to lay the groundwork for success\, teams must make certain critical decisions as early as possible. These decisions can have a significant impact on cost and can either increase or limit opportunities later in design. This presentation will look at: \n\nEarly project decisions and design steps\, focusing on how to optimize projects for mass timber\n\n\nConstruction types\, fire ratings\, column grids and beam/panel spans\, acoustics\, and MEP integration\n\n\nCompleted mass timber projects illustrating the variety of viable options when navigating these key decisions\n\nPlease join us for lunch following the seminar. \n  \nSpeaker: Mark Bartlett\, PE | WoodWorks \n  \nCredits: Attendees can earn 2.0 AIA/CES HSW LUs\, 2.0 PDH credits or 0.2 ICC credits \n  \nLocation: \nMaggiano’s Little Italy Houston \n2019 Post Oak Blvd.\nHouston\, TX 77056 \nTuscany Room \n  \nPhone: 713-961-3565 \nDirections \nEvent Parking: free \n  \nFor questions or additional information\, please contact: \nJaime Krohn\, CMP | jaime@woodworks.org | (312) 841-8272 \n  \nImage: Trinity University Dicke Hall + Business and Humanities District\, Lake Flato Architects\, Datum Engineers\, Robert Benson Photography
URL:https://www.woodworks.org/event/q4-25-early-design-decisions-mass-timber-in-person-bartlett/
LOCATION:Maggiano’s Little Italy\, 2019 Post Oak Boulevard\, Tuscany Room\, Houston\, TX\, 77056\, United States
CATEGORIES:In Person
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/2a8125f10dc80f34fa83219959434968-5jee1l.tmp_.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20251113T100000
DTEND;TZID=America/Los_Angeles:20251113T130000
DTSTAMP:20250923T191113Z
CREATED:20250923T190302Z
LAST-MODIFIED:20250923T191113Z
UID:10000406-1763028000-1763038800@www.woodworks.org
SUMMARY:Mass Timber in Multi-family Construction: Mid-Rise and Beyond
DESCRIPTION:Regional In-Person Seminar (Seattle\, WA)\n\n\nCan mass timber make financial sense for mid-rise multi-family construction? What new opportunities does the 2021 International Building Code create for mass timber housing in the 6 to 18-story range? While mass timber is often associated with one-off projects that celebrate innovation over repeatability\, options for multi-family buildings that provide a strong return on investment have never been greater—if a designer understands how to leverage the benefits of these materials in the context of the new mass timber construction types. This presentation will review decisions that are key to the viability of mass timber multi-family projects\, including construction type selection\, grid layout\, approach to achieving fire-resistance ratings\, lateral system selection\, and acoustics. \n  \nSpeaker: Michael Muller\, PE\, SE | WoodWorks \n  \nCredits: Attendees can earn 2.0 AIA/CES HSW LUs\, 2.0 PDH credits or 0.2 ICC credits \n  \nLocation: \nNational Nordic Museum \n2655 NW Market Street \nSeattle\, WA 98107 \nClassroom 1 \nMap/Directions \nParking: The National Nordic Museum’s parking lot is located on the south side of the building and can be accessed from the corner of NW Market St and 28th Ave NW. Parking starts at $2.00 per hour and must be paid at the parking kiosks located at the base of the stairs or online via Premium Parking(Opens an external site). \nAlternative parking options are available along NW Market Street\, in the residential neighborhoods surrounding the Museum\, and at the Hiram Chittenden Locks parking lot—a five-minute walk to the Museum. \nPublic Transit: Ballard is serviced by Metro buses 17\, 40\, 44\, and the D Line. \n  \nFor questions or additional information\, please contact: \nJaime Krohn\, CMP | jaime@woodworks.org | (312) 841-8272 \n  \nImage: The Canyons\, Kaiser+Path\, Catena Consulting Engineers\, Photo Jeremy Bittermann
URL:https://www.woodworks.org/event/q4-25-mass-timber-multi-family-muller-in-person/
LOCATION:National Nordic Museum\, 2655 Northwest Market Street\, Classroom 1\, Seattle\, WA\, 98107\, United States
CATEGORIES:In Person
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/Canyons-Exterior-SW-corner-night_Bittermann-1-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251113T130000
DTEND;TZID=America/New_York:20251113T140000
DTSTAMP:20260422T172039Z
CREATED:20251001T204820Z
LAST-MODIFIED:20260422T172039Z
UID:10000409-1763038800-1763042400@www.woodworks.org
SUMMARY:Designing Light-Frame Wood Structures Over Podiums: Wind Considerations
DESCRIPTION:
URL:https://www.woodworks.org/event/designing-light-frame-wood-structures-over-podiums-wind-considerations/
LOCATION:OR
CATEGORIES:Online
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/JJ-Carroll-ApartmentsDJI_0676.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20251114T161500
DTEND;TZID=America/Los_Angeles:20251114T174500
DTSTAMP:20251022T160019Z
CREATED:20251015T150932Z
LAST-MODIFIED:20251022T160019Z
UID:10000411-1763136900-1763142300@www.woodworks.org
SUMMARY:Mercer International Middle School Tour: A Firsthand Look at Mass Timber
DESCRIPTION:Regional In-Person Tour (Seattle\, WA)\n\n\nThis unique educational event will provide an in-depth look at Asa Mercer International Middle School\, a Type III-B mass timber school recently completed in Seattle\, WA. Designers of the multi-story\, 174\,000 sqft project utilized CLT and glulam post-and-beam framing to create a sustainable learning environment that serves 1\,000 students in grades 6-8. Attendees will tour the site with project team members\, who will share strategies for successful and code-compliant mass timber projects\, including insight into design\, detailing\, and construction techniques utilized throughout the building. The tour format encourages questions and discussion\, and attendees can expect to leave with insights on the project’s design\, execution\, and factors that influenced material and detail selection. \n  \nHost: Michael Muller\, PE\, SE | WoodWorks \n  \nCredits: Attendees can earn 1 AIA LU/HSW\, 0.1 ICC credits \n  \nLocation: \nAsa Mercer Middle School \n7201 Beacon Ave South \nSeattle\, WA\, 98108 \nParking available in School parking lot \n  \nFor questions or additional information\, please contact: \nJaime Krohn\, CMP | jaime@woodworks.org | (312) 841-8272 \n  \nRenderings: Mercer Middle School / Bassetti Architects
URL:https://www.woodworks.org/event/q4-25-mercer-school-tour-muller/
LOCATION:Asa Mercer Middle School\, 7201 Beacon Ave South\, Seattle\, WA\, 98108\, United States
CATEGORIES:In Person
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/25695f36802ea2f81eb06daec1c7574d-U3rBVm.tmp_.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20251119T123000
DTEND;TZID=America/Chicago:20251119T170000
DTSTAMP:20251112T153309Z
CREATED:20251021T205709Z
LAST-MODIFIED:20251112T153309Z
UID:10000415-1763555400-1763571600@www.woodworks.org
SUMMARY:Code Meets Classroom: Tall Wood Design and Mass Timber Schools
DESCRIPTION:Regional Online & In-Person Event (Nashville\, TN)\n\n\nJoin us for a two-part seminar on mass timber design topics\, followed by a tour of the new Franklin Road Academy Upper School in Nashville. \n  \nPart One | Exploring Tall Wood: New Code Provisions for Tall Timber Structures\nLearn about the background and adoption of the new code provisions in the 2021 International Building Code\, including the technical research and testing that supported their adoption\, the new construction types introduced\, and examples of successful tall wood buildings. \n  \nPart Two | Classrooms to Cafeterias: Mass Timber Design in Modern Schools \nExplore how mass timber is transforming K–12 school design\, with insights on cost\, speed\, sustainability\, and code compliance. This presentation will cover the school construction market\, design and performance considerations\, and real-world case studies illustrating the successful implementation of mass timber in school projects across the country. \n  \nTour | Franklin Road Academy Upper School \nGet a first-hand look at mass timber in an educational project. Project team members will lead the tour of this 32\,000-square-foot building—featuring a cross-laminated timber (CLT) roof—and share insights into the design\, construction\, and material selection process. \n  \nCredits: Attendees can earn 2.0 AIA/CES HSW LUs\, 2.0 PDH credits or 0.2 ICC credits for the seminar and 1.0 AIA/CES HSW LU\, 1.0 PDH credit or 0.1 ICC credit for the tour \n  \nSpeakers: Jessica Scarlett\, EIT\, LEED AP | WoodWorks \n  \nIn-Person Attendees: \nIn-person includes a networking lunch from 12:30pm – 1:00pm and tour from 4-5pm. \n  \nSeminar and Lunch Location: \nCommunity Foundation of Middle Tennessee \n3421 Belmont Blvd \nNashville\, TN 37215 \nMap & Directions \nEvent Parking On-site \n  \nTour Location: \nFranklin Road Academy \n4700 Franklin Pike \nNashville\, TN 37220 \nMap & Directions \nEvent Parking On-site \n  \nOnline Attendees: \n\nOnline seminar 1:00 – 3:30\nWoodWorks will send each attendee a certificate of completion within 2 weeks via email.\nPlease note that to receive a certificate\, attendees must stay for the duration of the event.\n\n  \nFor questions or additional information\, please contact: \nLeeAnn Charpentier\, CMP | leeann.charpentier@woodworks.org | (301) 633-0330 \n  \nFranklin Road Academy\, Anecdote Architectural Experiences\, EMC Structural Engineers\nPhoto Anecdote Architectural Experiences
URL:https://www.woodworks.org/event/q4-25-code-meets-classroom-hybrid-scarlett/
LOCATION:OR
CATEGORIES:In Person,Online
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/ca79dcb48456eda6c2d79b5ce4235584-lZtjnI.tmp_.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20251120T140000
DTEND;TZID=America/Chicago:20251120T153000
DTSTAMP:20251015T184943Z
CREATED:20251015T183715Z
LAST-MODIFIED:20251015T184943Z
UID:10000413-1763647200-1763652600@www.woodworks.org
SUMMARY:Campus Tour: Walmart's New Mass Timber Home Office
DESCRIPTION:Regional In-Person Tour (Bentonville\, AR)\n\n\nThis unique educational event will provide an in-person look at Walmart’s new Home Office in Bentonville\, AR\, which includes 2.4 million square feet of mass timber office space. The 350-acre mixed-use campus comprises 12 new office buildings\, featuring regionally sourced mass timber in designs that aim to express the company’s values and prioritize views of nature and connectivity across the sprawling campus. The tour will highlight the detailing and construction techniques utilized throughout the buildings to achieve successful and code-compliant mass timber construction. Attendees will hear from Walmart leaders\, architects\, and engineers about the synthesis of this enormous and cutting-edge project. \nJoin us for an optional networking happy hour following the tour. \n  \nHost: Jason Bahr\, PE | WoodWorks \n  \nCredits: Attendees can earn 1.50 AIA/CES HSW LUs\, 1.5 PDH credits or 0.15 ICC credits \n  \nLocation: \nWalmart Home Office \nWalton Family Whole Health & Fitness Center \n1400 SE 5th Street\, Bentonville\, AR \nMeet in lobby\, then escorted to Communication Stairs \nParking garage \n1400 SE 5th Street\, Bentonville\, AR \n  \nPlease note: Registration closes at 12:00 pm\, Monday\, November 17. No walk-ins or substitutions. \n  \nFor questions or additional information\, please contact: \nJaime Krohn\, CMP | jaime@woodworks.org | (312) 841-8272 \n  \nImage credit: Walmart
URL:https://www.woodworks.org/event/q4-25-walmart-tour-bahr/
LOCATION:Walmart Home Office\, 1400 SE 5th Street\, Bentonville\, AR\, 72716\, United States
CATEGORIES:In Person
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/dd8d037f4e737a66d651c48664a33211-argS3S.tmp_.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20251120T153000
DTEND;TZID=America/New_York:20251120T163000
DTSTAMP:20251021T153528Z
CREATED:20251017T140507Z
LAST-MODIFIED:20251021T153528Z
UID:10000414-1763652600-1763656200@www.woodworks.org
SUMMARY:Building Tour: A Firsthand Look at Avalon Bay Brewer’s Hill
DESCRIPTION:Regional In-Person Tour (Baltimore\, MD)\n\n\nThis unique educational event will provide an in-depth look at the Avalon Bay Brewer’s Hill project in Baltimore. Attendees will tour this Type III multi-family project\, comprised of seven stories of light-frame wood over a concrete podium. At approximately 450\,000 sq ft\, the development will house nearly 400 units plus amenities and commercial space. \n  \nAttendees will tour the site with project team members\, who will share strategies for successful light-frame wood projects\, from concept to construction. The tour format encouraged questions and discussion\, and attendees can expect to leave with insights into design\, detailing\, and construction techniques utilized\, as well as material selection and wood’s role in meeting sustainability and budget goals. \n  \nFollowing the tour\, please join us for networking and complimentary drinks and appetizers at Gunther & Co.\, located just a short walk from the tour site. \n  \nPPE: This is an active jobsite. Accessibility will be limited. PPE required. Please bring your own PPE\, a limited amount will be available onsite. \n  \n\n\nCredits: Attendees can earn 1.0 AIA/CES HSW LU\, 1.0 PDH credit or 0.1 ICC credit \n  \nSpeakers: John O’Donald II\, PE | WoodWorks \n  \nTour Location: \nAvalon Bay Brewer’s Hill \n3700 Boston St. \nBaltimore\, MD 21224 \n  \nNetworking Location: \nGunther & Co \n3650 Toone St \nBaltimore\, MD 21224 \n  \nFor questions or additional information\, please contact: \nLeeAnn Charpentier\, CMP | leeann.charpentier@woodworks.org | (301) 633-0330 \n  \nImage: BCT Design Group
URL:https://www.woodworks.org/event/q4-25-avalon-bay-brewers-hill-tour-odonald/
LOCATION:Avalon Bay Brewer’s Hill\, 3700 Boston Street\, Baltimore\, MD\, 21224\, United States
CATEGORIES:In Person
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/2025-09-15-Avalon-Bay-Brewers-Hill-Boston-Street-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251121T123000
DTEND;TZID=America/Detroit:20251121T143000
DTSTAMP:20251117T213239Z
CREATED:20251024T205259Z
LAST-MODIFIED:20251117T213239Z
UID:10000417-1763728200-1763735400@www.woodworks.org
SUMMARY:Mass Timber Tour: Upper Macungie Township Community Lifestyle Center
DESCRIPTION:*This event has been postponed and will be rescheduled for a future date\nRegional In-Person Tour (Allentown\, PA)\n\n\nThis unique educational event will showcase one of North America’s longest timber spans\, currently being built in Pennsylvania’s fast-growing Upper Macungie Township. Totaling 188\,000 square feet\, the Upper Macungie Township Community Lifestyle Center is a community hub comprising an indoor soccer field\, two flex gyms\, and an amenity building. \nThe focal point is the 130\,000-square-foot soccer field\, where hybrid glulam-steel portal frames spanning 280 feet—one of the longest timber truss clear-spans in North America—were engineered to meet the architect’s vision of an efficient yet visually appealing structure. The basketball court structures were designed with hybrid glulam-steel trusses clear-spanning up to 140 feet\, supported by a glulam frame. \nAttendees will get an up-close look at the design and construction challenges the architect\, engineer\, and contractor overcame to achieve a timber span of this scale. \nPlease join us for lunch before the tour. The tour will begin at 1 pm. This event will be held entirely outdoors\, so we recommend dressing comfortably for the weather! \n  \nPPE: This is an active jobsite. Accessibility will be limited. PPE required. Please bring your own PPE\, a limited amount will be available onsite. \n  \nCredits: Attendees can earn 1.5 AIA/CES HSW LUs\, 1.5 PDH credits or 0.15 ICC credits \n\n\n  \nSpeaker: Shannon Williams\, PE | WoodWorks \n  \nLocation: \nUpper Macungie Township Community Lifestyle Center \n340 Grange Road \nAllentown\, PA \n  \nParking available on site \n  \nFor questions or additional information\, please contact: \nLeeAnn Charpentier\, CMP | leeann.charpentier@woodworks.org | (301) 633-0330 \n  \nImage: FLOR Projects / StructureCraft
URL:https://www.woodworks.org/event/q4-25-upper-macungie-tour-williams/
LOCATION:Upper Macungie Township Community Lifestyle Center\, 340 Grange Road\, Allentown\, PA\, 18106\, United States
CATEGORIES:In Person
ATTACH;FMTTYPE=image/jpeg:/wp-content/uploads/2025_09_09_StructureCraft_Edits_FirstDraft-18-scaled.jpg
END:VEVENT
END:VCALENDAR