Skip to content
Loading Events
  • This event has passed.

Early Design Decisions: Priming Mass Timber Projects for Success

July 16 @ 11:00 am - 1:30 pm EDT

  • Online
Register

Regional Online Seminar (NY)

Mass timber is a unique, non-commodity building material and, to lay the groundwork for success, certain critical decisions must be made as early as possible. These decisions can have a big impact on cost and can either increase or limit opportunities later in design. There are many cases of project teams that want to realize the full benefits of mass timber, but, because they base their designs on traditional building practices instead of optimizing them for mass timber, end up with avoidable price premiums. This presentation will walk through early project decisions and design steps, focusing on how to optimize projects for mass timber and how one early decision can influence others. Topics will include construction types, fire ratings, column grids and beam/panel spans, acoustics and MEP integration. Completed mass timber projects will be used to illustrate the variety of viable options when navigating these key decisions.

 

Speaker: Momo Sun, PE, PEng, LEED Green Associate | WoodWorks

 

Attendees can Earn 2.0 AIA/CES HSW LUs, 2.0 PDH credits or 0.2 ICC credits

 

Online Attendees:

WoodWorks will send each attendee a certificate of completion within 2 weeks via email.

Please note that to receive a certificate, attendees must stay for the duration of the event.

 

For questions or additional information, please contact:

LeeAnn Charpentier, CMP | leeann.charpentier@woodworks.org | (301) 633-0330

 

Image: INTRO / Hartshorne Plunkard Architecture / Forefront Structural Engineers / Photo Aerial Agents